The boundary of production activities starts from the completion of the Hydropower plant and preparation for power generation.
Included activities ends
The boundary of production activities ends when electricity reaches the grid connection point of power generation.
Description
This dataset represents electricity generation from run-of-river hydropower plants of average scale in a specific region, i.e., a weighted combination of different scales (small-<50 MW, medium->=50, <300 MW, and large->=300 MW).
Activity Description
The activity boundary of the product's production encompasses the entire operational and maintenance phase of the run-of-river Hydropower plant, including processes such as water release to drive turbines for power generation and daily equipment maintenance.
Process Description
The product is grid-connected electricity measured in kWh, with a voltage level of ≥35 kV.
Time period
2022
2026
Geography
China,Xinjiang Uygur Autonomous Region
Geography comment
Forming regional average data based on official statistical data.
Macroeconomic value
Business-as-Usual
Data validation
Yes
Technology
Current Technology
Technology comment
The run-of-river hydropower plant have no regulating reservoirs. Here, various combinations of installed capacities are considered. Hydropower plant parameters are set according to design standards: small-scale hydropower projects have a technical service life of 30 years, medium-scale projects 50 years, and large-scale projects 100 years.