This process represents the infrastructure construction as well as the demolition and decommissioning of a Chinese large-sized advanced treatment water treatment plant. It is assumed that all building materials and equipment are processed and installed at the water treatment plant. At this stage, the materials consumed include cement, timber, steel reinforcement, sand, gravel, steel pipes and fittings, etc., and the energy consumption mainly comprises the diesel and electricity used for construction and installation. For the demolition, recovery and disposal stage of the materials, it is assumed that metal materials and timber have a recovery rate of 90%, while other materials are treated by landfill. The data are mainly sourced from publicly available guidelines of industry associations.