This data set represents the consumable heat for district heating in Tianjin, China, taking into account the infrastructure required for delivery to heat users, water replenishment, energy consumption, and heat losses in the process. Among them, the infrastructure covers the heating pipe network composed of primary pipe network, thermal station and secondary pipe network; due to the limitation of data availability, the amount of water replenishment mainly considers the primary pipe network and thermal station part, and the power transmission and distribution consumption mainly considers the thermal station part. The heat loss rate of the primary pipe network directly uses statistical data and is weighted based on the proportion of heat sources in specific regional cogeneration and regional boilers. The heat loss rate of the secondary pipe network is difficult to accurately count due to insufficient monitoring equipment, fuzzy boundaries of heat loss, incomplete data records at the management level, and inconsistent statistical standards. Therefore, the heat loss of the secondary pipe network is not calculated separately.