The on-site construction and installation of the heating pipe network is divided into civil engineering and pipeline installation engineering, taking into account key facilities and equipment including pipelines, insulation pipes, corrugated compensators, etc., and the technical service life is 30 years. A unified assumption is adopted for the decommissioning and dismantling stage, that is, it is assumed that the recovery rate of metal materials, wood, and cables is 90%, plastics and rubber products are disposed of as non-recyclable materials, and the remaining waste is disposed of as inert waste.