This dataset describes the iron ore mining in China using the filling method. The process flow is as follows:
1. Preparation Phase
Drift Development: Firstly, main transportation and ventilation drifts are excavated at the lower part of the ore body to provide access for subsequent mining operations. Excavation typically starts from the bottom of the ore body and progresses upward layer by layer.
Mining Area Division: Based on the geological conditions of the ore body, it is divided into several horizontal layers for step-by-step mining. The thickness of each layer depends on the ore body thickness and stope stability, typically ranging from 10 to 30 meters.
2. Section Mining
Ore Fragmentation: The ore body is fragmented using drilling and blasting techniques, and the ore is removed from the stope and transported to the surface mineral processing plant for treatment. After fragmentation, the ore is conveyed via haulage drifts to either surface or underground processing facilities.
Ore Transport: Ore is transported to the processing plant for treatment using mine cars, belt conveyors, or other mechanized transport equipment.
3. Backfilling of Goaf
Backfill Materials: Commonly used materials include tailings, waste rock, cement, or paste fill. These materials are transported via pipelines to the goaf and evenly fill the void. For areas requiring higher stability, cemented backfill materials, such as mixtures of cement or slag with tailings, are typically used.
Backfill Methods: Backfilling can be implemented using either total tailings cemented fill or waste rock fill. After backfilling, the structural stability of the stope is ensured, preventing surface subsidence or collapse of the goaf.
4. Upper Orebody Extraction
Stepwise Advancement: Once backfilling of the lower goaf is completed, mining of the upper orebody proceeds, advancing progressively upward to ensure safety and stability of the mine stope.