This is a fixed infrastructure representing the construction of a township-level wastewater treatment plant. The infrastructure represents the components of the wastewater treatment plant. The lifespan of this wastewater treatment plant is 30 years. The required area is 28,305 m². The process includes materials required for construction, construction works, land use, and decommissioning of all materials.